Proj No. | B1025-251 |
Title | Medium Voltage Fault Auto Restoration Algorithm |
Summary | Faults occur in Medium Voltage Electrical Networks when assets within the power system age or encounter external interferences. Such faults cause the overall electrical network integrity to be weakened, increasing the likelihood of outages when asset failure occurs on multiple instances simultaneously. In this project, the student is tasked to design an algorithm that can be used to recommend steps to provide immediate network restoration or reinforcement during a fault. Students undertaking power engineering specialization are recommended |
Supervisor | Dr Foo Yi Shyh Eddy (Loc:S1 > S1 B1C > S1 B1C 89, Ext: +65 67904519) |
Co-Supervisor | - |
RI Co-Supervisor | - |
Lab | Clean Energy Research (Loc: S2-B7c-05) |
Single/Group: | Single |
Area: | Electrical Power and Energy |
ISP/RI/SMP/SCP?: | ISP: Bryan Lee Zhen Yuan Executive Engineer SP Group Pte Ltd Bryanlzy1@spgroup.com.sg |